90-DAY INTEGRATION

EBITDA recovery on the factory floor

We embed former plant managers directly into your production facilities. No theoretical frameworks. Just 90 days of aggressive waste elimination and supply chain stabilization.

90 Days

to target lock

100%

former plant managers

A high-contrast wide-angle view of a steel fabrication facility, overhead industrial crane, natural overcast daylight pouring through high warehouse windows, cool steel tones, safety-orange accents on machinery.
A high-contrast wide-angle view of a steel fabrication facility, overhead industrial crane, natural overcast daylight pouring through high warehouse windows, cool steel tones, safety-orange accents on machinery.
THE TIMELINE

Three phases of floor-level execution

Day 1 to 30: Floor-level audit

Day 31 to 60: Physical execution

Day 61 to 90: Baseline stabilization

We map every physical process directly on the shop floor. We trace material flow, identify bottleneck machinery, and pinpoint immediate margin leaks.

Our embedded veterans implement process changes directly alongside your floor workers. We restructure line layouts and eliminate operational friction.

We lock in the new operational baseline to secure permanent EBITDA-positive performance. We run rigorous shift-level audits to ensure changes hold.

THE DIFFERENCE

Floor execution vs. slide decks

Theoretical Advisors

Embedded Plant Managers

They deliver 200-page slide decks from comfortable boardrooms, leaving your team to solve the actual operational friction alone.

We wear steel-toed boots and work directly on your production floor for 90 days to guarantee real, measurable EBITDA improvements.

Ready to secure your margin?

Contact our team today to schedule an immediate floor audit and identify post-acquisition leaks.